ST1 - GPU Project

Thermion supplied and installed moulded insulation mattresses for valves, flanges, equipment and instrumentation pipes for St1's new facility at the Gothenburg refinery. The spring solution makes them very easy to temporarily remove for inspections and service work. The assignment started in the summer of 2023 and was completed at the turn of the year 2023/-24.

In total, about 7200 valves and flanges were insulated with this type of removable and fixed insulation.

In total, more than 12,000 mattress units were delivered, and at the peak of production about 750 mattresses per week.

For more information, please contact Peter Ericsson

The pictures show typical mattress solutions realised by Thermion
customer
St1 Refinery in Gothenburg
Developer
St1 Refinery in Gothenburg
Execution time
2023

More pictures

Read more

Skärmavbild 2025 06 25 kl. 09.13.04

Energy efficiency at the dairy

Thermion insulation makes a real difference. A large Swedish dairy has reduced its energy needs by 2,890 MWh and saved 128 tonnes of CO₂ - every year. That's both a step towards climate goals and a substantial cost saving.
Img 0658

Evaporation Gruvön Mill

Thermion was entrusted with the insulation work for Billerud's "Evaporation" project at the Gruvön paper mill in Grums.
Thumbnail image001 (1)

Volvo TB2

In total, Thermion installed about 4,000 square metres of aluzinc and mesh in several layers.